PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor Facing West.jpg Layout for the Attorneys Room Facing East.jpg Started installing curtain wall mullions at the Monumental Stairs Facing West.jpg Block work at 1st floor Sally ports Facing West.jpg Block work at corridor 149 Facing South.jpg Installing black iron duct work at the 4th floor Facing South.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing VAV boxes at the 3rd floor Facing East.jpg EPDM Roofing at the High Roof Facing East.jpg
Previous pageNext page Block work at corridor 149 Facing South
Block work at corridor 149 Facing South